PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Door Frames at the 2nd floor UCIA Rooms Facing South.jpg Installed concrete planks at the 2nd floor Facing West.jpg Installed pipe hangers at the 4th floor Facing East.jpg laying out block along column line 3.3 between H-K.jpg Laying out block at the 2nd floor UCIA Facing North.jpg STarted installing the main raiser at the 3rd floor Facing North.jpg Storm piping for the low roof Facing South.jpg Waste and vent piping at the 4th floor Facing North.jpg
Previous pageNext page Laying out block at the 2nd floor UCIA Facing North
Laying out block at the 2nd floor UCIA Facing North